top of page
Abusag Bridge
Project Overview
The 511 meters Abusag Bridge includes 649.863 meters of approaches. It features 16 piers with diameters ranging from 2 to 2.20 meters, as well as 2 abutments of similar diameter. The project also incorporates drainage structures and slope protection measures.
Project Impact
The project aims to decrease travel time between Tuguegarao City and Baggao from the current two hours and 30 minutes to just one hour and 30 minutes. This improvement is expected to benefit 15,000 travelers daily.
bottom of page